| 
“Atlas Construction was able to achieve results beyond our
expectations given the complex nature of the design implemented for
a very demanding client. The project management skills demonstrated
by ATLAS were a key component in delivering Lawton VA on time and
in budget while adhering to the design intentions of the client and
architect.” Hoefer Wysocki
Architects, LLC
Kansas City, KS
Kevin Berman, Vice President
Director of Design |
“I would highly recommend this company for any
construction project.” Tulsa
Public Schools
Chris Hudgins, Project Manager/Architect
|
| “The Lawton-Fort Sill Veteran’s
Center is not just the crown jewel of Commanche County or the State
of Oklahoma, but the crown jewel of the nation.” Oklahoma
Governor
Brad Henry |

|
| “This is the most amazing thing
this school has done…it was designed with education in mind.
People in Blanchard that tour this building will be sticking their
chests out.” Blanchard
Board of Education
Mike Whaley, Chairman
|
| “Comments from the community
are very favorable toward the design and construction of this facility,
and ATLAS served as the contractor.” Tulsa
Junior College
Dean P. VanTrease, President
|
| 
|
“ATLAS has cooperated fully with the Owner, the Owners
Representatives, separate/outside contractors and this Architectural
Firm. The Facility was ready for occupancy when school began as specified.”
Graber and Imel Architects
John Bradley |
| “ATLAS has shown integrity by demanding quality
work from their sub-contractors. ATLAS does not use shortcuts and
insure that jobs are done “right.” Their work will stand
up to long-term commercial/public use. My nature is to give attention
to detail and they share the same concern. ATLAS has provided excellent
follow-through with my frequent detail-oriented interruptions.”
Tulsa Public Schools, Principal
Derrick Schmidt
|
“Many of you have been under the misconception that the Taj
Mahal is in India. In Lawton-Fort Sill we have the Taj Mahal. Nothing
is too good for our veterans.”
Department of Veterans
Affairs
Norman Lamb,
Oklahoma Cabinet Secretary
|
| “ATLAS has demonstrated the
difference between craftsmanship and construction.”
OK Dept. of Veteran Affairs
Director Phillip Driskill
|
| “From the time that we awarded the bid until
completion, I have found ATLAS to be dedicated to constructing a good
facility. Their staff has been professional and friendly.”
Mayes County Board of Commissioners
Jimmy Montgomery, Chairman
|

|
“ATLAS participated in a very detailed systems commissioning
process that tested and verified proper operation and performance
of the highly complex systems.” “We are proud of the construction
quality and performance of ATLAS. We believe the efforts of the OSU
team and the design/construction team have made this project a “showcase”
for everyone involved.” Affiliated
Engineers
Jerry A. Schuett, P.E., Principal
|
“On behalf of those who continue to serve,
I thank you for the magnificence of this facility and for the honor
that you do veterans.” Maj.
General Michael Maples
Fort Sill Commander
|
“The construction of the Lawton/Ft. Sill Veterans Center has
been the most remarkable construction project I have ever observed.”
Maj. General Retired
Lee Baxter
Former Commander, Ft. Sill
Army Post
|
| “I am writing to commend the ATLAS staff
on the successful completion of the West Chilled Water Plant and Distribution
Improvements – Phase I project at Oklahoma State University.
Thanks to a good effort on the part of your company, we were well
prepared for the extremely hot, dry weather that plagued us in August
and September of the year.” Oklahoma
State University
Jeffrey D. Stewart, Director,
Engineering and Utilities
|
 |
“A special thanks for your attention to cost
and helping us to attain the most facility for a reasonable cost.
The quality of the finished product is also something that deserves
recognition. We have had many visitors since our opening in April
1999 of which each has commented on what a “GREAT” facility
we have. Again, our sincere thanks for a superb job.”
Tulsa Winch
Paul Rinehart, V.P. of Operations
|
“This is the nicest, most beautiful facility for veterans in
the nation.” OK
Dept. of Veteran Affairs
Director Phillip Driskill
|
| “As the owner and user of the Lawton/Ft. Sill
Veterans Center, I want to commend you for your excellent performance
during the pre-construction, construction, and post-construction activities
of the Lawton/Ft. Sill Veterans Center. It has been said by architects,
designers, and construction personnel, that this project was the most
complex project that they have worked on. The extra effort you put
forth in meeting the various challenges presented by the complexity
of design and finishes, are preserved in the overall finished product.
The various level of project management, from owner to carpenter,
proved to be an invaluable asset in the timely completion of our building.”
Department of Veterans Affairs
Dwain Webb, Head Administrator
|
 |
“This building is more than bricks, mortar
and rock. Think about what this building is for those who preserved
the right for you and I to come together for an occasion like this.”
Lawton Mayor
Cecil Powell
|
“ATLAS provided early cost comparisons of systems which with
their continued budget reviews and input established early in the
project the construction cost for the project. ATLAS monitored the
budget throughout the process to eliminate cost overruns. The compouterized
method of cost review and control provided by ATLAS kept everyone
updated on the status of the project’s budget.” “I
would recommend ATLAS anytime your construction project demands cost
controls, a tight time frame and a high level of quality work. It
was a pleasure to work with such a professional team.”
Danny R. Mitchell Architect, PC
Danny Mitchell, AIA, NCARB
|
| “As the Owner’s Representative,
we wish to express our gratitude to Atlas General Contractors for
a “job well done.” As the general contractor for this
new 57,462 square-foot elementary school project, your execution of
the project was very professional, and we are very pleased with the
quality of work performed. It was indeed a pleasure to work with you.”
Vernon E. Hawkins
Owner’s Representative, PMg
|
| “The willingness of you and your superintendent
to resolve issues in an expedient and fair manner was a benefit to
the owner and the project. We would be pleased to recommend you for
future projects. Good luck to you and your project team. We look forward
to the opportunity to work with you again." BKL,
Inc.
Kim D. Reeve, A.I.A.
|
 |
“Innovative construction techniques such as computer
aided just in time delivery and web based project management enabled
ATLAS to create the necessary communication between key team members,
consultants and sub-contractors to make this project a great success.”
Hoefer Wysocki Architects,
LLC
Kansas City, KS
Kevin Berman, Vice President
Director of Design
|
| “I found ATLAS personnel very
good to work with. They conducted themselves in a professional manner.
Owner/Engineer/Contractor meetings were held on a weekly basis, so
job progress knowledge was always current.” Oklahoma
State University
Jeffrey D. Stewart, Director, Engineering and Utilities
|
| “If you are considering a new
building or an addition to an existing building, we have no hesitation
in recommending ATLAS General Contractors.” USD
480, Liberal, Kansas
George Fisher, Board of Education President
Kenny Sizemore, Board of Education Vice President
|